NPMAI ECOSYSTEM · TECHNICAL & TECHNO-ECONOMIC RESEARCH PAPER · 2026 · REVISION 2

INTEGRATED PLASTIC RECYCLING

A Shared-Infrastructure, Three-Train System for the Recovery of rPET (via BHET Glycolysis), Reclaimed Rubber, and Compounded Carbon-Filled Polyolefin from Mixed Post-Consumer Waste

Revision 2 keeps the founding idea, one plant that accepts co-mingled waste and returns three independently sellable materials, and rebuilds the process around it. The bioreactor, the zeolite hydrolysis bed, the acid leach and the H₂S-to-acid loop are removed. A monomer-purification cascade, a vacuum-vented compounding line and a multi-sensor front end are added. The cost model is restated with a realistic Lang factor, an itemized opex, an energy balance and a market-checked product price, and the plant is staged so that the risky chemistry is built last.

Multi-Sensor Front End Hot Caustic Wash BHET Glycolysis + Purification Cascade Twin-Screw Devulcanization Dry H₂S Capture Three-Phase Build
3
parallel recovery trains, one shared front-end
73.8%
blended product yield after 7 % front-end rejects
$123M
capex at 200 t/day (Rev 1 restated: $155M)
19.5%
ROI (EBITDA / capex) at 200 t/day, base case
—

About the Organisation

NPMAI ECOSYSTEM is an research and development company that publishes across chemistry, process engineering, and applied AI. It does not treat "research" and "shipped tooling" as separate departments — the belief underneath both is that serious technical work should be published in the open, checked by whoever wants to check it, and built on by the next person for free.

This paper is part of the organisation's ongoing programme on circular-economy reactor design — taking mixed, difficult-to-sort post-consumer waste streams and building a single plant capable of recovering more than one saleable material from them at once, rather than requiring feedstock to already be sorted into a single clean stream before it can be processed at all.

Revision 2 of an open research programme: every equation, assumption and cost line is stated so that anyone can check it, challenge it, and build on it.
Open Source Chemistry Research Division Tech & Political Science Research Division npmai.netlify.app
—

About the Authors

Trilok Varma
Chemistry Research Division

Trilok Varma

Researcher Chemistry Department(Former HOD Research Chemistry Department) · npmaiecosystem@gmail.com
Sonu Kumar
Tech & Research Division

Sonu Kumar

Founder & HOD Research, Tech & Former HOD Research Political Science · sonuramashishnpm@gmail.com
—

Table of Contents

  1. Introduction & What Changed in Revision 2
  2. Reaction Chemistry & Unit Operations
  3. The Three-Train System & Patent Diagram
  4. Methodology — Governing Equations
  5. Mass & Energy Balance
  6. Techno-Economic Analysis
  7. Comparative Analysis
  8. Advantages & Disadvantages
  9. Environmental Impact & Off-Gas Management
  10. Workplace & Process Safety
  11. Development Plan & Decision Gates
  12. Discussion
  13. Conclusion
  14. References
01

Introduction & What Changed in Revision 2

Mixed post-consumer waste — co-mingled plastic, rubber, and carbon-filled material arriving together rather than pre-sorted — is the norm for almost every real waste stream, and the norm for almost every recovery process is to treat it as a problem rather than a feedstock. Single-stream routes solve one fraction and send the rest to landfill or incineration.

This paper reports a plant designed around the opposite assumption. A shared front end — bale breaking, metal removal, multi-sensor sorting, float–sink and ballistic separation — splits mixed waste into three lines that share sorting, water, heat, nitrogen, vacuum and control infrastructure. The PET line washes flake in hot caustic, depolymerizes it by glycolysis to bis(2-hydroxyethyl) terephthalate (BHET), purifies the BHET by filtration, carbon and ion-exchange polishing and crystallization, and repolymerizes it to rPET chips. The rubber line devulcanizes crumb thermo-mechanically in a twin-screw extruder with process oil and captures its own off-gas in a dry scavenger. The carbon line washes and compounds carbon-black-filled polyolefins into black pellets in a vacuum-vented twin-screw extruder.

Revision 1 of this paper proposed a different PET route (acid leach, zeolite hydrolysis and an Ideonella sakaiensis bioreactor), a DPDS-mediated rubber route, and an internal H₂S-to-H₂SO₄ acid loop. A line-by-line review found that its strongest claims did not hold: the organism consumes the monomers, no purification step existed between hydrolysis and repolymerization, the acid loop was worth about $68k/yr, and the fiber price had no market comparable. Revision 2 replaces those elements and restates the economics. Table 1 lists every change and the reason for it.

1.1 Change log

Rev 1 elementRev 2 decisionReason
36 % H₂SO₄ acid leach (108) with Alloy 20 / PTFE-lined vessels, applied to all feedReplaced by a hot caustic wash for the PET and polyolefin lines only; rubber sees no acidThe acid leach would strip ZnO from rubber and forces corrosion-resistant alloys plus neutralization. Hot caustic wash is the standard PET flake wash and runs in stainless steel.
H-ZSM-5 zeolite fluidized-bed hydrolysis (112), 165 °C at 2.5 barReplaced by glycolysis to BHET (118): 190–200 °C, atmospheric, EG as reagent and solventPolymer chains cannot enter zeolite micropores, and the catalyst never appeared in the kinetic model. Saturated steam at 165 °C is about 7 bar, so 2.5 bar meant superheated steam and a low water concentration. Hydrolysis also leaves EG dilute in a large water volume.
DFB quench and fines trap (114, 116)Removed; hot filtration (120) takes over the solids-removal roleCooling to 30 °C existed only to protect the bioreactor. Nothing downstream needs it.
Ideonella sakaiensis immobilized-frame bioreactor (118), wiped-film dehydrator (120), disc-stack centrifuge (122)RemovedThe organism assimilates TPA and EG, so it consumes the product [1]. It needs pH 7.2 against an acidic hydrolysate, an 18 h residence time (hundreds of m³), sparging, CIP and biomass removal, and it does nothing for nylon.
No monomer purification between hydrolysis and repolymerizationAdded: EG evaporation (122), aqueous carbon + ion-exchange polishing (124), BHET crystallization (126–128), drying (130)Spinnable-grade polymer needs polymer-grade monomer. Dyes, catalyst residue and oligomers must be removed and EG recovered.
Joint PET / nylon 6,6 hydrolysis and separate repolymerization (124, 126)Nylon removed from the chemical line; sorted and baled (108)Mixed monomer streams cannot be repolymerized cleanly. Nylon 6,6 also needs nylon-salt crystallization and a pressurized autoclave stage (it melts near 265 °C and HMDA is volatile), for a small share of feed.
Ti(OBu)₄ at 300 ppm Ti; Sb₂O₃ rejectedCorrected to 10–20 ppm Ti plus a phosphorus stabilizer (Sb₂O₃ kept as a fallback for non-food fibre)300 ppm is antimony-level dosing; at that level a Ti catalyst causes yellowing and thermal degradation.
Coaxial spinning with pH 4 / pH 9 coagulation baths (128)Deferred to Phase 3 as conventional melt spinning; base plant sells rPET chipsMelt-spun PET and nylon are not coagulated. A spinning line is also a separate business with its own qualification and customers.
DPDS devulcanization autoclave (130), solvent wash (132), Banbury (134), re-vulcanization press (136)Replaced by a twin-screw thermo-mechanical devulcanization extruder (142) with process oil, a two-roll mill (146) and a QC lab (148)DPDS at 2.5 phr is about 495 t/yr at 200 t/d, a large reagent bill against the rubber revenue line. The extruder route is documented in the patent literature [11], and customers re-vulcanize themselves.
H₂S combustion, V₂O₅ SO₂ converter and SO₃ absorber (144–150) feeding acid back to the leachRemoved; dry scavenger bed + caustic polish scrubber + VOC control (144)Rev 1's own benchmark credit was about $68k/yr, roughly 0.2 % of opex, for three pieces of exotic equipment. With no acid leach there is no acid sink. Off-gas is still contained, sized for 100 % of flow.
N₂ purge at the carbon extruderReplaced by two vacuum ventsVacuum venting removes moisture and volatiles, improving odour and mechanical properties at lower cost.
NIR + density sorter (104)Upgraded to multi-sensor sorting, float–sink and ballistic separation, with an explicit reject streamNIR cannot see black plastics; PVC must be removed; nylon and rubber overlap in density.
Lang factor 2.2; fiber at $3,000/t; 50 / 30 / 20 feed split with no rejects; mass balance onlyRestated: Lang 3.1 with 15 % contingency; rPET chips at $1,500/t; 45 / 28 / 17 split with 3 % nylon and 7 % rejects; full energy balance and itemized opexRev 1 understated installed cost, used a fiber price with no market comparable, and had no reject stream or energy balance.
Table 1 — Change log, Revision 1 → Revision 2. Every entry that alters cost or product quality is carried through Sections 2–6.

1.2 Scope and feed definition

02

Reaction Chemistry & Unit Operations

Eight stages carry mixed waste to three finished materials. Each is specified with its governing reaction or physical principle and its operating window. Windows are design targets drawn from the published glycolysis, reclaim and compounding literature and must be confirmed at bench and pilot scale.

2.1 Front-End Sorting & Pre-Treatment (100–108)

No chemistry occurs here, but the plant's product quality is set here. Bales are opened, metals are removed by overband magnet and eddy current, and a multi-sensor sorter combines near-infrared for PET, PP, PE and nylon, mid-infrared or hyperspectral imaging for dark polymers that near-infrared cannot see, and an XRF or chlorine signal that ejects PVC. A float–sink hydrocyclone bank separates polyolefins (density below 1.0 g/cm³) from PET, rubber and nylon (all above 1.0). Because rubber and PET both sink, an elastic/ballistic separator splits resilient rubber from rigid fragments. Nylon is baled for sale and the ≈7 % unsortable residue is routed to RDF or disposal. Design targets for PET flake entering the glycolysis reactor are PVC ≤ 100 ppm and metals ≤ 50 ppm.

2.2 Hot Caustic Wash (110–116, 150–152)

PET is granulated to ≤ 8 mm and washed in friction washers at 85–90 °C with 1–2 wt% NaOH and about 0.3 wt% surfactant for 15–20 minutes, then rinsed to neutral in a three-stage counter-current train and dried to below 0.5 wt% moisture. This removes label adhesive, oils and food residue. It is the standard PET flake wash and needs only stainless steel. The dark polyolefin fraction is washed in a similar but smaller line (150). Rubber is not acid- or caustic-washed; it is cleaned mechanically (Section 2.7).

2.3 Glycolysis — PET to BHET (118)

Dry PET flake is depolymerized in ethylene glycol (EG : PET ≈ 3 : 1 by mass) with zinc acetate at about 0.5 wt% of PET, at 190–200 °C and atmospheric pressure, for about two hours. The vessel is agitated, condensed and blanketed with nitrogen: EG is combustible, and oxygen exclusion prevents discolouration. Moisture is held below 0.5 wt% to limit hydrolytic side reactions.

[–CO–C₆H₄–CO–O–CH₂CH₂–O–]ₙ + n HOCH₂CH₂OH ⇌ n HOCH₂CH₂O–CO–C₆H₄–CO–O–CH₂CH₂OH (BHET)Eq. 1
Catalyst Zn(OAc)₂, 190–200 °C, atmospheric. EG excess drives the equilibrium; the design target is about 85 % conversion to BHET monomer with the remainder as dimers and trimers that recycle with the mother liquor.
2 HOCH₂CH₂OH → HOCH₂CH₂OCH₂CH₂OH (DEG) + H₂OEq. 2
Diethylene glycol formation is the main side reaction. DEG built into PET lowers melting point and thermal stability, so it is controlled by temperature, time and the purification cascade that follows.

Glycolysis replaces Revision 1's hydrolysis for three reasons. EG is both reagent and solvent, so no large water inventory has to be heated and later evaporated. The step runs at atmospheric pressure in 316L. And the product, BHET, can be purified by crystallization and fed to polycondensation without an esterification stage.

2.4 Monomer Purification Cascade (120–130)

This block did not exist in Revision 1 and is what makes spinnable-grade polymer possible.

2.5 Polycondensation (132)

Molten BHET (melting point ≈110 °C) enters a prepolymerizer and then a finisher at 265–280 °C, with pressure stepped down to below 1 mbar over about 2.5–3 hours. Titanium catalyst is dosed at 10–20 ppm (Ti basis), for example titanium(IV) butoxide or a chelated Ti, with a phosphorus stabilizer and an organic toner for colour. Antimony trioxide at 200–250 ppm Sb remains the low-cost, colour-stable fallback where the end use is non-food fibre or strapping.

n HOCH₂CH₂O–CO–C₆H₄–CO–OCH₂CH₂OH ⇌ [–CO–C₆H₄–CO–O–CH₂CH₂–O–]ₙ + (n−1) HOCH₂CH₂OHEq. 3
Removal of EG is rate-limiting, hence the vacuum and the surface-generating finisher (Eq. 18). Recovered EG returns to 122 and 118. The target is IV 0.62–0.70 dL/g; bottle-grade IV 0.80 would need solid-state polymerization, which is not in the base plant.

2.6 Chip Finishing and Optional Spinning (134, 136)

The melt is filtered, pelletized underwater, crystallized and dried below 50 ppm moisture. Spinning is not part of the base plant. If built (Phase 3), it uses conventional melt spinning: dried chips, extruder, spin pack, cross-flow quench air, godets and winder to give POY or FDY yarn. Melt-spun PET is quenched in air, not coagulated in a bath.

2.7 Rubber Train — Thermo-Mechanical Devulcanization (140–148)

Rubber is granulated to ≤ 2 mm, freed of fibre and steel, and screened. It is devulcanized in a co-rotating twin-screw extruder (L/D ≥ 40) at a peak barrel temperature of 200–220 °C, 150–300 rpm and 2–4 minutes residence, with 3–5 phr of aromatic-free process oil. A twin-screw route to reclaim is described in the patent literature [11]. Compared with Revision 1's batch autoclave with DPDS at 12 rpm and 30 minutes, the extruder is continuous, needs no expensive reagent, and shares its technology base with the carbon line.

Rubber–Sₓ–Rubber →(shear, 200–220 °C)→ Rubber–Sₐ• + •Sᵦ–Rubber (a + b = x)Eq. 4
Mechanical and thermal scission of sulfur crosslinks.
Rubber–S• + R′–H → Rubber–SH + R′•Eq. 5
Hydrogen transfer from oil caps the radical. Thiols formed this way are the source of trace H₂S and mercaptans in the off-gas.
BondDissociation energyRole
S–S (network)~240 kJ/molPrimary crosslink — target for cleavage (polysulfidic links are weaker still)
C–S~272 kJ/molSecondary crosslink
C–C (backbone)~347 kJ/molMust survive to preserve polymer properties
C–H~413 kJ/molNot cleaved in the operating window
Table 3 — Bond dissociation energies [2]. The ordering explains why crosslinks are the preferred scission site; it does not guarantee selectivity. Selectivity is measured by Flory–Rehner crosslink density and Horikx analysis (Eq. 21–22), not assumed.

Off-gas (144). A hood at the die and vent feeds a dry scavenger bed (ZnO or iron oxide), a caustic polish scrubber sized for 100 % of off-gas flow including upsets, and VOC control (carbon or thermal oxidation, sized after assay).

ZnO + H₂S → ZnS + H₂OEq. 6
Scavenging reaction. Stoichiometric media demand is 2.39 kg ZnO per kg H₂S (Eq. 24). Spent media is a ZnS / FeS residue.

The product is sheeted and cooled on a two-roll mill (146) and baled. The plant contains no re-vulcanization press; customers compound and cure reclaim themselves. A QC laboratory (148) measures cure behaviour, Mooney viscosity, tensile properties and crosslink density.

2.8 Carbon Train — Vacuum-Vented Compounding (150–158)

Washed, dried dark polyolefin is compounded in a co-rotating twin-screw extruder with a four-zone profile of 180 / 200 / 220 / 220 °C at 120 rpm and about 90 seconds residence. Two vacuum vents at 50–100 mbar absolute remove moisture and volatiles, which replaces Revision 1's nitrogen purge, cuts operating cost and improves odour. A continuous screen changer (156) filters the melt and a strand or underwater pelletizer (158) finishes the pellets. This is a physical step; the carbon black stays in the compound.

03

The Three-Train System & Patent Diagram

The apparatus is specified with a reference numeral and a defined function for every component. Solid boxes are in the reference plant; dashed boxes are optional or supporting units.

SHARED FRONT-END — 100 % of feed 100Feed hopperbale breaker 101Magnet + eddymetal removal 102Multi-sensor sorterNIR · MIR · XRF/PVC 104Float–sinkhydrocyclone bank 106Elastic / ballisticrubber vs rigid 108Nylon bale + rejects nylon bale (not credited) · ≈7 % residue to RDF PET TRAIN — 45 % of feed 110Granulator+ pre-wash 112Hot caustic wash85–90 °C · 1–2 % NaOH 1143-stage rinsewater loop 116Flake dryer< 0.5 % moisture 118Glycolysis195 °C · Zn(OAc)₂ · EG 120Hot filtersolids · PVC char 122EG evaporationrecycle EG → 118 124Dissolve + polishcarbon · ion exchange 126BHET crystallizercooling, from water 128Centrifugewash BHET 130BHET dryerpolymer-grade 132PolycondensationTi 10–20 ppm · <1 mbar 134Melt filter+ pelletizer 136Melt spinningPhase 3 · optional rPET chipsIV 0.62–0.70 dL/g Yarn (POY/FDY)only if built EG released in 132 returns to 122 and 118 · BHET mother liquor recycles to 118 RUBBER TRAIN — 28 % of feed 140Granulator≤ 2 mm · fibre/steel out 142Twin-screw devulc.200–220 °C · oil 3–5 phr 146Two-roll millsheet · bale Reclaimed rubbersheet / bale 144Off-gas capturehood · ZnO bed · scrubber 148QC labcrosslink density · Mooney CARBON (POLYOLEFIN) TRAIN — 17 % of feed 150Friction wash+ sink-float 152Dryer 154Twin-screw extruder180–220 °C · vacuum vents 156Melt filterscreen changer 158Pelletizerstrand / underwater Black PO pelletscarbon-black filled SHARED UTILITIES & OFFSITES 160Wastewater + water recycle 162Steam / thermal-oil plantheat recovery from 122, 132 164N₂ · air · cooling · vacuum

FIG. 1 — Revision 2 process flow. Sorted streams leave the shared front-end on the right-hand trunk and enter the PET, rubber and carbon lines. Dashed red: optional Phase 3 spinning and the QC laboratory.

3.1 Reference Numeral Legend

No.ComponentFunction
100Feed receiving hopper & bale breakeropens bales and meters mixed waste onto the sorting line
101Overband magnet + eddy-current separatorremoves ferrous and non-ferrous metal before size reduction
102Multi-sensor sorterNIR for PET / PP / PE / nylon; MIR or hyperspectral imaging for dark polymers; XRF or chlorine signal to eject PVC
104Float–sink hydrocyclone banksplits polyolefins (< 1.0 g/cm³) from PET, rubber and nylon (> 1.0 g/cm³)
106Elastic / ballistic separatorseparates resilient rubber pieces from rigid plastic fragments
108Nylon-bale and reject bunkerssorted nylon / engineering plastics baled for sale; ≈7 % residue routed to RDF or disposal
110PET granulator + pre-washsizes PET to ≤ 8 mm flake and removes loose dirt
112Hot caustic wash85–90 °C, 1–2 wt% NaOH + surfactant in friction washers; strips labels, adhesive and food residue
1143-stage counter-current rinse + water looprinses flake to neutral pH and recycles rinse water
116Flake dryerdries PET flake to < 0.5 wt% moisture ahead of glycolysis
118Glycolysis reactoragitated, N₂-blanketed, 316L; 190–200 °C, EG : PET 3 : 1, zinc acetate; converts PET to BHET and oligomers
120Hot filterpressure-leaf or candle filter; removes undissolved solids, PVC char and metal fines
122EG / water multi-effect evaporatorvacuum evaporation recovers excess EG to 118 and 132 and concentrates the BHET
124Aqueous dissolution + polishingBHET concentrate dissolved in hot water; activated carbon removes colour bodies; cation exchange removes Zn²⁺
126BHET cooling crystallizercrystallizes BHET from water; mother liquor recycled to 118
128Pusher / peeler centrifugeseparates and washes BHET crystals
130BHET dryerdries BHET to polymer-grade monomer
132Polycondensation trainprepolymerizer + finisher, 265–280 °C, pressure stepped to < 1 mbar; Ti catalyst (10–20 ppm) + phosphorus stabilizer
134Melt filter + underwater pelletizerfilters the melt and produces rPET chips; chip crystallizer / dryer downstream
136Melt-spinning line (Phase 3, optional)chip dryer, extruder, spin pack, quench air, godets and winder for POY / FDY yarn
140Rubber shredder / granulator + screensreduces to ≤ 2 mm crumb; fibre and steel removal
142Twin-screw devulcanization extruderthermo-mechanical devulcanization, 200–220 °C peak, process oil 3–5 phr
144Off-gas capturehood at die and vent, dry ZnO / iron-oxide scavenger bed, caustic polish scrubber, VOC control
146Two-roll mill / sheeter / balerhomogenizes, cools and packs reclaimed rubber
148QC laboratorycuremeter, Mooney viscometer, tensile testing, crosslink-density (swelling) test
150Friction washer + sink-float tankwashes the dark polyolefin fraction
152Polyolefin flake dryerdries washed flake
154Twin-screw compounding extruder180 / 200 / 220 / 220 °C, 120 rpm, ≈90 s; two vacuum vents replace an N₂ purge
156Continuous melt filterscreen changer for uninterrupted filtration
158Pelletizerstrand or underwater pelletizing
160Wastewater treatment & water recycletreats caustic-wash and rinse water; returns recycled water to 112–114 and 150
162Steam / thermal-oil heating plantsupplies 118, 122, 132; recovers heat from 122 and 132 vapours
164N₂, compressed air, cooling water, vacuum utilitiesinert gas for 118 / 132; vacuum for 122 and 132
Table 2 — Reference numerals for FIG. 1. Numeral 136 is an optional Phase 3 unit and is not included in the reference cost.

3.2 Materials of Construction

ZoneMaterials of constructionBasis
Hot caustic wash, rinse, polyolefin wash (112, 114, 150)304 / 316L stainless steel1–2 wt% NaOH at 85–90 °C; no acid duty, so no high-alloy or PTFE-lined vessels
Glycolysis reactor, hot filter, EG evaporator (118–122)316L; 2205 duplex if chloride in the filtrate is measured above trace190–200 °C hot glycol; N₂-blanketed; chloride from PVC carry-over is the corrosion risk; no copper alloys
Polishing, crystallizer, centrifuge, dryer (124–130)316LAqueous BHET, 20–80 °C
Polycondensation train (132)316L with thermal-oil jackets265–280 °C under deep vacuum
Devulcanization extruder (142)Nitrided or hard-faced barrel and screwsAbrasive fillers and sulfur species at 200–220 °C
Off-gas capture (144)Carbon-steel scavenger vessels with lining; 316L or polypropylene-lined caustic scrubberH₂S, mercaptans and VOC; wet caustic duty in the scrubber
Compounding extruder (154)Carbon steel with hardened barrel linerStandard compounding duty, 220 °C maximum
Table 4 — Materials-of-construction specification by reference numeral.

3.3 Novel Mechanical Configuration

The individual reactions are, by design, not the novel element. What this section proposes as new is the integration of one sorting-led front end, one utility system and three purpose-built lines with closed internal loops.

ElementStructural novelty proposedFunctional effect
Shared multi-sensor front-end and shared utilities (100–108, 160–164) serving three chemically distinct linesOne sorting, water, heat, nitrogen and vacuum system for PET, rubber and carbon lines, with the sorter acting as the plant's quality controlRemoves duplicated infrastructure; utilities and offsites and the front end are the largest shared capex lever
Glycolysis–filtration–evaporation–polishing–crystallization cascade with a closed EG and mother-liquor loop (118–130, 132)Mixed-colour, post-consumer PET flake is converted to polymer-grade BHET in a plant that also handles rubber and polyolefin; EG released in polycondensation returns to glycolysisVirgin-grade monomer from unsorted colour; no water-heavy hydrolysis and no biological stage
Dry sulfur-capture chain on the rubber extruder (142 → 144)Hood, scavenger bed, 100 %-rated caustic polish and VOC control as a containment chain, not a recovery loopContains H₂S and mercaptans at the source at low capex
Vacuum-vented carbon compounding (154)Two-vent vacuum degassing in place of an N₂ purgeLower operating cost and better odour and mechanical properties
Table 5 — Mechanical elements proposed for claim drafting. This is an engineering specification, not legal advice. Glycolysis and devulcanization are each extensively published, so novelty, if any, lies in the integration; actual patentability depends on a formal prior-art search with qualified counsel.
04

Methodology — Governing Equations

Every figure in Sections 5 and 6 traces to an equation below or to a stated assumption in Table 7a. Parameters marked as measured (Ea, De, KF, χ, K, a) are determined in bench work, not assumed from generic literature values.

4.1 Glycolysis Kinetics (118)

X(t) = 1 − (1 − k·t / r₀)³Eq. 7
Shrinking-core, surface-reaction control (Levenspiel [3]).
k = A·exp(−Eₐ / R·T)Eq. 8
Arrhenius rate constant, measured per flake geometry.
t/τ = 1 − 3(1−X)^(2/3) + 2(1−X)Eq. 9
Diffusion through a product layer.
τ = ρ·r₀² / (6·b·D_e·C_EG)Eq. 10
EG replaces water as the diffusing reagent. ρ = flake density; D_e = effective diffusivity of EG in the swollen flake at 195 °C; C_EG = EG concentration; b = stoichiometric coefficient. Flake size ≤ 8 mm keeps τ within the two-hour window.

4.2 EG Balance and Thermal Duty

m_EG,rec = m_PET · (R − 0.323)Eq. 11
R = EG : PET mass ratio (3.0 in this design). 0.323 = 62.07 / 192.16 is the EG mass consumed per unit PET mass in forming BHET.
Q_gross = Σ m·c_p·ΔT + m_EG,rec · ΔH_vapEq. 12
ΔH_vap ≈ 0.85 GJ/t for EG under vacuum evaporation.
Q_net = (1 − η_hi) · Q_grossEq. 13
η_hi ≈ 0.34 heat-integration credit from multi-effect evaporation and vapour heat recovery. Values in Table 6a.

4.3 Filtration, Crystallization and Adsorption (120–128)

dV/dt = A·ΔP / [ μ·( α·c·V/A + R_m ) ]Eq. 14
Ruth cake-filtration equation for the hot filter (120).
Y = 1 − C*(T_f) / C₀Eq. 15
Cooling-crystallization yield of BHET from water, with C* the solubility at the final temperature. Solubility curve to be measured.
q = K_F · C^(1/n)Eq. 16
Freundlich isotherm used to size activated-carbon dose for colour removal (124).

4.4 Polycondensation (132)

X̄ₙ = 1 / (1 − p)Eq. 17
Carothers equation (AB-type BHET) [4]. With M₀ = 192.16 g/mol per repeat unit, p = 0.99 gives X̄ₙ = 100 and Mₙ ≈ 19,200 g/mol, the region of textile-grade IV 0.62–0.70. Driving p toward 1 requires efficient EG removal, so the vacuum stage is a functional requirement.
N_EG = k_L·a·V_L·( C_EG − C*_EG )Eq. 18
EG removal rate; C*_EG rises with EG partial pressure, so lower pressure and larger surface renewal raise the rate.
[η] = K · MᵃEq. 19
Mark–Houwink relation between intrinsic viscosity and molecular weight; K and a are solvent-specific and fitted to lab data.

4.5 Devulcanization and Rheology (142, 154)

SME = ( P_motor·f_load − P_idle ) / ṁEq. 20
Specific mechanical energy. Planning value 0.35 kWh/kg for the rubber extruder, to be measured in the pilot.
ν = − [ ln(1−v_r) + v_r + χ·v_r² ] / [ V_s·( v_r^(1/3) − v_r/2 ) ]Eq. 21
Flory–Rehner crosslink density from equilibrium swelling [7]. v_r = rubber volume fraction in swollen gel; χ = interaction parameter; V_s = solvent molar volume.
D = ( 1 − ν_d / ν₀ ) × 100 %Eq. 22
Degree of devulcanization. Horikx analysis [8] of sol fraction against crosslink density distinguishes crosslink scission from main-chain scission, which is the selectivity test.
τ_shear = K · γ̇ⁿEq. 23
Power-law shear-thinning melt model (n < 1) for extruders 142 and 154.

4.6 Off-Gas Scavenging (144)

m_media = ṁ_H₂S · ( M_ZnO / M_H₂S ) / u = 2.39 · ṁ_H₂S / uEq. 24
M_ZnO = 81.38 and M_H₂S = 34.08 g/mol; u = media utilization (0.30 design). Used in Table 13.

4.7 Techno-Economic Equations

Cost(C) = max[ 0.15·Base , Base·( C·frac / 10 )ⁿ ]Eq. 25
Six-tenths-rule scaling with a 15 % floor, as in Rev 1. n = 0.60–0.75 by equipment type; frac = the equipment's own-stream share of feed (1.0 front-end and utilities, 0.45 PET, 0.28 rubber, 0.17 carbon).
Total Capex = ( Σ DEC × Lang 3.1 ) × ( 1 + 0.15 )Eq. 26
Effective installed factor 3.57. Peters & Timmerhaus [5] give Lang factors of about 3.1 for solids and 3.6 for solid–fluid plants; Rev 1's 2.2 was below both.
EBITDA = Revenue − Opex ; ROI = EBITDA / Capex ; Payback = Capex / EBITDAEq. 27
ROI is EBITDA-based, as in Rev 1, and so ignores depreciation, tax, working capital and start-up. A discounted cash-flow model is the next step (Section 11).
05

Mass & Energy Balance

Basis: 1,000 kg (1 tonne) of mixed feed entering the front-end (100). Unlike Revision 1, the balance carries a nylon bale and a front-end residue, and it includes an energy balance.

StreamFeed in (kg)Yield chainOut (kg)Product
PET train (110–134)45095 % wash and flake × 84 % BHET recovery (mother-liquor recycled) × 96 % polycondensation and pelletizing = 76.6 %344.7rPET chips
Rubber train (140–148)28092 % crumb clean-up × 93 % devulcanization and screening = 85.6 %239.6Reclaimed rubber
Carbon train (150–158)17095 % wash × 95 % melt filtration and pelletizing = 90.3 %153.4Black polyolefin pellets
Nylon / engineering plastics30Sorted and baled (not credited in TEA)30.0Nylon bale
Front-end residue70Moisture, dirt, labels, PVC, metals, unsortable items0.0RDF / disposal
Total1,000Blended product yield 73.8 %767.7incl. 30.0 kg nylon bale
Table 5 — Mass balance per tonne of mixed feed. Product out excluding the nylon bale is 737.7 kg (73.8 %).

Scaled to the 200 t/day reference case over 330 operating days (66,000 t/yr): rPET chips ≈ 22,753 t/yr, reclaimed rubber ≈ 15,811 t/yr, black polyolefin pellets ≈ 10,126 t/yr, nylon bale ≈ 1,980 t/yr and residue ≈ 4,620 t/yr. In the PET train, 105.3 kg of each 450 kg is lost: about 22.5 kg in washing and flake preparation, about 68.4 kg in BHET purification purges, and about 17.2 kg in polycondensation and pelletizing.

5.1 Energy Balance

PET-line thermal dutyGJ per t PET in
Heating glycolysis charge to 195 °C (after hot-EG recycle)1.65
EG recovery: 2.68 t excess EG × ≈0.85 GJ/t2.28
BHET crystallization and drying0.20
Polycondensation melt heating and hold0.55
Caustic wash heating and flake drying0.60
Gross thermal duty5.28
Heat-integration credit (≈34 %, multi-effect EG recovery and vapour heat recovery)−1.78
Net purchased thermal energy3.50
Table 6a — Thermal duty of the PET line (Eq. 11–13).
AreaElectricity (kWh/t feed)Thermal (GJ/t feed)
Shared front-end (100–108)45—
PET train (110–134)202.51.575
Rubber train (140–148)126.0—
Carbon train (150–158)59.50.119
Utilities and offsites (160–164)10.0—
Total per tonne of mixed feed443.01.694
Table 6b — Energy balance per tonne of mixed feed. At 66,000 t/yr this is ≈29.2 GWh/yr of electricity (≈3.7 MW average) and ≈112 TJ/yr of heat.

Why glycolysis changes the energy picture

The thermal duty in Table 6a is dominated by EG recovery. Revision 1's hydrolysis route evaporates water instead. As an illustration, at an assumed 10 wt% monomer loading the hydrolysate carries about 9 t of water per tonne of PET, and evaporating it costs about 2.4 GJ per tonne of water, above 20 GJ per tonne of PET before any heat recovery. Loading was not stated in Revision 1, so this is illustrative, but the order of magnitude is why the water-based route was dropped.

06

Techno-Economic Analysis

The analysis uses the six-tenths-rule scaling of Eq. 25–27 on the 31-item equipment list of Tables 2 and 9. Unlike Revision 1, opex is itemized, prices are checked against 2026 market assessments where they exist, and results are compared with Revision 1 on a like-for-like basis. All figures are AACE Class 5 concept-screening estimates [12], not vendor quotations.

6.1 Basis and Assumptions (Table 7a)

ItemAssumptionBasis and note
Operating days, feed330 d/yr; 200 t/d reference (66,000 t/yr)As Rev 1
rPET chips$1,500/t base; sensitivity $1,200–1,800Argus (6 Feb 2026) assessed food-grade rPET pellets at about $1,225/t (Asia), $1,521/t (US West Coast) and $1,654/t (NW Europe), and colourless flake at about $810–1,130/t [13]. $1,500/t is in the upper half of that range and is defensible only if BHET-derived chips earn a chemical-recycling premium over mechanical and virgin material. Fibre demand was reported weak in Q1 2026 [14].
Washed PET flake (Phase 1)$700/tBelow the colourless-flake range above, since flake is mixed-colour
Reclaimed rubber$450/t; sensitivity $300–700Carried over from Rev 1; no public price benchmark was located
Black polyolefin pellets$750/t; sensitivity $600–900Argus lists transparent rLDPE pellets at about $735–1,160/t [13]; pellets from dark carbon-filled feed price at or below the low end
Nylon baleNot creditedUpside only
Feedstock$60/t deliveredAssumption; may be negative for some streams (sensitivity $0–150)
EnergyElectricity $0.10/kWh; heat $10/GJSite-dependent
Labour14 + 0.3 × t/d full-time staff at $45,000 loaded (74 FTE at 200 t/d)Includes a minimum crew
Maintenance; insurance, G&A and QA3.5 % and 2.0 % of installed capex per yearTypical process-industry ranges
Installed-cost factorLang 3.1 × 1.15 contingencyEq. 26
Residue disposal; packaging and logistics$90/t of residue; $25/t of productAssumption
Table 7a — Techno-economic basis. Base equipment costs are planning-grade values assembled for this revision.

6.2 Results by Capacity

t/dayt/yrCapexRevenueOpexEBITDAROIPayback (yr)
1330$4.52M$0.24M$0.97M−$0.72M-16.0%n/a
103,300$17.05M$2.44M$2.44M$0.00M0.0%n/a
309,900$35.09M$7.33M$5.17M$2.15M6.1%16.29
5016,500$49.15M$12.21M$7.69M$4.52M9.2%10.87
7524,750$64.28M$18.31M$10.69M$7.62M11.9%8.44
10033,000$77.79M$24.42M$13.61M$10.80M13.9%7.20
15049,500$101.85M$36.63M$19.29M$17.34M17.0%5.87
20066,000$123.35M$48.84M$24.83M$24.01M19.5%5.14
Table 7 — Rev 2 techno-economic analysis at eight capacities (Eq. 25–27), full three-train plant. ROI = EBITDA / Capex, as in Rev 1. Class 5 planning estimates; see Section 6.1.

Reading the small-scale rows

At 1 t/day EBITDA is negative and at 10 t/day it is about zero, because a minimum crew and equipment cost floors are spread over too little product. The plant earns a positive EBITDA above roughly 10 t/day, but return on capital only becomes attractive at scale: ROI is 13.9 % at 100 t/day and 19.5 % at 200 t/day, with payback falling from 7.2 to 5.1 years. Small-scale deployment is not recommended.

6.3 Revenue, Opex and Capex at 200 t/day

Revenue is $48.8M: rPET chips $34.1M (70 %), reclaimed rubber $7.1M and polyolefin pellets $7.6M. The PET train supplies most of the revenue and about 42 % of equipment cost, so the plant's economics are the PET chip price.

Cost line (200 t/day)$/yrShare
Feedstock$3.96M16.0%
PET chemicals & consumables$3.24M13.1%
PET electricity$1.34M5.4%
PET thermal energy$1.04M4.2%
Rubber chemicals & media$1.12M4.5%
Rubber electricity$0.83M3.3%
Polyolefin chemicals & consumables$0.25M1.0%
Polyolefin electricity + thermal$0.47M1.9%
Front-end electricity & consumables$0.56M2.3%
Utilities, offsites (electricity, N2, air, water)$0.26M1.1%
Residue disposal$0.42M1.7%
Product packaging & logistics$1.22M4.9%
Labour$3.33M13.4%
Maintenance$4.32M17.4%
Insurance, G&A, QA$2.47M9.9%
Total opex$24.83M100.0%
Table 8 — Itemized opex at 200 t/day ($376/t feed). Rev 1 reported a single opex figure with no breakdown.
AreaPurchased equipment (DEC)Installed capex (× Lang 3.1 × 1.15)
Shared front-end (100–108)$8.1M$29.0M
PET train (110–134)$14.4M$51.4M
Rubber train (140–148)$4.2M$15.0M
Carbon / polyolefin train (150–158)$1.8M$6.5M
Utilities and offsites (160–164)$6.0M$21.4M
Total$34.6M$123.4M
Table 9 — Capex by area at 200 t/day. Equipment base costs are planning-grade values assembled for this revision, not vendor quotations.

6.4 Comparison with Revision 1

Case (200 t/day)CapexOpexEBITDAROIPayback (yr)
Rev 1 as published (fiber $3,000/t, Lang 2.2)$109.7M$33.2M$52.6M48.0%2.09
Rev 1 restated (fiber $1,500/t, Lang 3.1, opex as published)$154.6M$33.2M$18.0M11.6%8.60
Rev 2 — full plant (base case)$123.4M$24.8M$24.0M19.5%5.14
Rev 2 — Phase 1 only (PET sold as washed flake at $700/t)$79.9M$18.1M$16.3M20.4%4.90
Table 10 — Like-for-like comparison. Rev 2 capex is 20 % below Rev 1 restated at the same Lang factor, and opex is 25 % below Rev 1's reported figure (indicative only, since Rev 1 did not itemize opex).

The headline ROI falls from Revision 1's 48.0 % to 19.5 %, and that is the honest figure. Revision 1's result rested on a $3,000/t fiber price about twice the level of recycled PET pellet assessments, and on a Lang factor of 2.2. Restated to a $1,500/t product and a Lang factor of 3.1, Revision 1 returns 11.6 %. Revision 2 is 20 % cheaper to build than that restated case and returns about 8 points more, with no biological unit and no acid loop to prove.

6.5 Sensitivity

Case (200 t/day)CapexEBITDAROIPayback (yr)
Base case$123.4M$24.0M19.5%5.1
rPET chips $1,200/t$123.4M$17.2M13.9%7.2
rPET chips $1,800/t$123.4M$30.8M25.0%4.0
Reclaimed rubber $300/t$123.4M$21.6M17.5%5.7
Reclaimed rubber $700/t$123.4M$28.0M22.7%4.4
Polyolefin pellets $600/t$123.4M$22.5M18.2%5.5
Polyolefin pellets $900/t$123.4M$25.5M20.7%4.8
Capex +30 %$160.4M$22.0M13.7%7.3
Lang factor 3.63 instead of 3.1$144.4M$22.9M15.8%6.3
Opex +15 %$123.4M$20.3M16.4%6.1
Feedstock $0/t (vs $60/t)$123.4M$28.0M22.7%4.4
Feedstock $150/t$123.4M$18.1M14.7%6.8
All product yields −10 %$123.4M$19.3M15.6%6.4
H₂S at 8 kg/t rubber (Rev 1 benchmark, disposable media)$123.4M$21.0M17.1%5.9
Combined downside: rPET $1,200, capex +30 %, opex +15 %, yields −10 %$160.4M$7.1M4.4%22.7
Combined upside: rPET $1,800, capex −10 %, feedstock $0$111.0M$35.5M32.0%3.1
Table 11 — One-at-a-time and combined sensitivities. Break-even rPET chip price is $445/t for zero EBITDA and about $1,260/t for 15 % ROI.

The plant remains above 13 % ROI across single-variable shocks except a capex overrun of 30 %, but the combined downside (a low chip price, a capex overrun, higher opex and lower yields together) collapses the return to about 4 %. The chip price and the capex factor dominate. The 8 kg/t H₂S case costs about 2 points of ROI, so it does not by itself break the design.

6.6 Staging and the Value of the PET Chemistry

A Phase 1 plant, built without the glycolysis, purification and polycondensation units (118–134) and selling washed flake at $700/t, costs $79.9M and earns $16.3M EBITDA (20.4 % ROI). Phase 2 adds $43.4M of capex and $7.7M of EBITDA, an incremental return of 17.7 % at $1,500/t chips. That return is very sensitive to the chip price.

rPET chip price ($/t)Incremental ROI, flake $700/tflake $500/tflake $900/t
$1,2002.0%15.0%-11.0%
$1,3007.3%20.3%-5.7%
$1,40012.5%25.5%-0.5%
$1,50017.7%30.7%4.7%
$1,80033.5%46.5%20.5%
Table 12 — Incremental return on the Phase 2 PET chemistry (+$43.4M capex) versus selling washed flake. Phase 2 reaches 15 % incremental ROI at about $1,450/t chips (flake at $700/t).

Phase 2 is therefore a market-gated decision, not a foregone conclusion. It clears 15 % incremental ROI only if chips sell at about $1,450/t or more, so signed offtake at or above that level should be a condition of committing its capital.

07

Comparative Analysis

RouteFeedstock flexibilityProduct qualityRelative capexTechnology riskCircularity
Mechanical recycling (grind and reprocess)Needs sorted, single-stream inputDegraded molecular weight, limited cyclesLowLowBasic reuse
Chemical recycling alone (glycolysis or methanolysis)Plastics only, needs reasonable sortingHigh (virgin-like monomer)HighModerate; commercially practisedCloses the PET loop
Enzymatic depolymerization (engineered PET hydrolases)Plastics only, needs amorphized PETHighHighHigher; scaling upCloses the PET loop
Conventional devulcanization (reagent-free)Rubber onlyModerateModerateLowRubber reuse
Landfill / incinerationAccepts anythingNoneLowest, ongoing liabilityLowNegative
Revision 1 designMixed waste, one front-endUnproven; no monomer purificationHigh (understated)High: biology, zeolite, acid loopInternal acid loop worth ≈0.2 % of opex
This work — Revision 2Mixed waste, one shared front-end; PVC and nylon sorted outVirgin-grade BHET → rPET chips; reclaim; black pelletsHigh, shared across three revenue streamsModerate: glycolysis and extruder devulcanization are established unit operationsClosed EG loop; contained off-gas; three saleable outputs
Table 14 — This route's case is breadth (one plant, three saleable outputs, mixed-feedstock tolerance) and a defensible cost base, not the lowest capex of any single comparison route.
08

Advantages & Disadvantages

Advantages

  • One sorting, water, heat and utility system serves three revenue streams from genuinely mixed waste.
  • Every unit operation is established: hot caustic wash, PET glycolysis, crystallization, polycondensation, twin-screw devulcanization and vacuum-vented compounding. There is no biological stage and no unproven catalyst.
  • The purification cascade gives virgin-grade monomer, and the closed EG loop keeps reagent cost low.
  • Off-gas is contained at the source by a dry scavenger sized for 100 % of flow.
  • The plant can be built in phases, with the market-dependent PET chemistry last and gated on offtake.
  • Opex is itemized, an energy balance is included, and prices are checked against 2026 assessments.

Disadvantages

  • Return is dominated by the rPET chip price, which needs a chemical-recycling premium; at $1,200/t ROI falls to 13.9 %.
  • Returns are attractive only at scale (100 t/day and above); small plants are not viable.
  • Equipment costs are Class 5 planning values; vendor quotations may move capex materially.
  • Mixed-colour feed drives carbon and ion-exchange consumption, and PVC or chloride carry-over threatens stainless equipment.
  • Devulcanization performance (crosslink scission versus chain scission) and the H₂S design basis of 0.5 kg/t are not yet measured.
  • Nylon is not recovered chemically, which leaves upside unused and a separate product to sell.
09

Environmental Impact & Off-Gas Management

Revision 1 built its environmental case on the H₂S-to-H₂SO₄ loop. Removing that loop does not remove the H₂S; it changes how the plant handles it, and it removes an unrelated wastewater-treatment gap.

9.1 Off-gas from the rubber line

H₂S generation (kg / t rubber)H₂S (t/yr)ZnO-equivalent media (t/yr, 30 % utilization)Media cost ($/yr at $2.7/kg)
0.59.274$0.20M
355.4442$1.19M
8147.81,178$3.18M
Table 13 — Off-gas scavenging at 200 t/day (18,480 t/yr of rubber). The 0.5 kg/t design basis is an assumption pending assay; Rev 1's 8 kg/t benchmark is shown for comparison.

At the 0.5 kg/t design basis, 9.24 t/yr of H₂S is generated. A dry scavenger bed sized on Eq. 24, backed by a caustic polish scrubber for the mercaptan and VOC fraction, is inexpensive at this scale and needs no exotic alloys. If bench assay instead confirms Revision 1's 8 kg/t benchmark, spent-media cost rises to about 3.18$M/yr (Table 13) and a wet caustic scrubber sized for the higher load, or a switch back to a reagent-free devulcanization process, should be reconsidered. Either way, the off-gas is contained rather than converted to a low-value credit.

9.2 Wastewater

The hot caustic wash and rinse trains (112–114, 150) generate a continuous wastewater stream carrying surfactant, dissolved organics and suspended solids. Revision 1 specified no wastewater treatment. Revision 2 adds a treatment and water-recycle unit (160): screening, dissolved-air flotation for oil and grease, then biological treatment (or discharge to a municipal system where permitted) before recycling water back to 112–114 and 150. This is a compliance requirement, not an option, at 200 t/day.

9.3 Life-cycle framing

10

Workplace & Process Safety

HazardLocationControl
Hot caustic (1–2 % NaOH, 85–90 °C)112, 150Closed washer housings, eyewash and safety-shower stations, PPE, SOP for charging and draining
Ethylene glycol — combustible, toxic by ingestion118, 122, 132N₂-blanketed vessels, bunded storage, LEL monitoring, no ignition sources in the glycolysis area
Zinc acetate, activated carbon dust118, 124Dust control, PPE, contained dosing
Hot BHET / polymer melt (up to 280 °C)118, 132Insulated lines, thermal-burn PPE, interlocks on access panels
H₂S and mercaptans from devulcanization142, 144Fixed H₂S detectors, hooded capture at the die, forced ventilation, permit-to-work for confined-space entry near 144, SCBA available on site
Process-oil mist and heat142Local exhaust ventilation, guarding, burn PPE
PVC / chlorine carry-over102, 118XRF or chlorine-signal rejection at the sorter; chloride monitoring on the glycolysis filtrate protects stainless and duplex equipment
Dust and fines (front-end, extruders)100–106, 154Dust collection, ATEX-rated equipment in dusty zones, housekeeping SOPs
Confined space (vessels, filters, evaporators)118, 120, 122, 160Permit-to-work, atmospheric testing, rescue plan
Table 15 — Principal hazards and controls. Rev 1's Incoloy-lined SO₃ converter and thiophenol/DPDS hazards are removed along with the units that created them; PVC handling and H₂S/mercaptan containment remain the dominant hazards.

What Revision 1's safety case missed

The SO₃ absorption step (Eq. 30 in Revision 1) absorbed SO₃ directly in water, which forms a corrosive acid mist rather than the 98 % acid used industrially, and it required an Incoloy-lined converter for a credit worth about 0.2 % of opex. Revision 2 avoids that hazard by not building the unit. Revision 1 also did not specify a wastewater treatment system despite a continuous caustic and rinse discharge; Section 9.2 closes that gap.

11

Development Plan & Decision Gates

11.1 Build order

11.2 Decision gates before committing capex

11.3 Explicitly out of scope for this revision

12

Discussion

The central claim of this revision is narrower than Revision 1's. Revision 1 argued that a single reactor system could recover fibre, rubber and carbon at a 48 % ROI, underwritten in part by an internal acid loop. That loop turns out to be worth about 0.2 % of opex, its PET route had no path from hydrolysate to spinnable polymer, and its bioreactor consumed the product it was meant to protect. None of that means the founding idea, one shared front-end serving three chemically distinct, independently sellable product lines, is wrong. It means the chemistry inside two of the three lines needed replacing, and the third needed a purification block it never had.

What remains after that replacement is closer to conventional process engineering than to novel chemistry: hot caustic washing, PET glycolysis, BHET crystallization, melt polycondensation and twin-screw devulcanization are all documented, commercially practised unit operations. The contribution this design makes is architectural, sizing and integrating three trains under one sorter and one utility system, and staging capital so the proven, low-risk lines are built first and the market-dependent PET chemistry is gated on signed offtake.

The economics are honest but less exciting than Revision 1's headline: 19.5 % ROI at 200 t/day against a $1,500/t chip price that sits at the upper half of current market assessments, falling to 13.9 % at $1,200/t. That sensitivity, not a single point estimate, is the number to carry into an investment decision, and it is the reason Section 11 treats offtake price as a gate rather than an assumption.

13

Conclusion

Revision 2 keeps the shared-front-end, three-train concept and replaces the parts of Revision 1 that did not hold up: the acid leach, the zeolite hydrolysis bed, the Ideonella sakaiensis bioreactor and the H₂S-to-H₂SO₄ loop are removed; a glycolysis-to-BHET route with a full monomer-purification cascade, a corrected polycondensation catalyst window, a twin-screw devulcanization line, vacuum-vented compounding and a multi-sensor front end are added. The techno-economic model is restated with an itemized opex, an energy balance, a realistic Lang factor and market-checked prices. At 200 t/day the result is $123M of capex against $155M for Revision 1 restated to the same Lang factor, and 19.5 % ROI with an 18-case sensitivity table rather than a single number. The plant is staged in three phases so the cheapest, lowest-risk lines fund operations while the PET chemistry is validated and gated on offtake before its capital is committed.

—

References

  1. Yoshida, S. et al. "A bacterium that degrades and assimilates poly(ethylene terephthalate)." Science 351, 1196–1199 (2016).
  2. Luo, Y.-R. Comprehensive Handbook of Chemical Bond Energies. CRC Press (2007).
  3. Levenspiel, O. Chemical Reaction Engineering, 3rd ed. Wiley (1999). Shrinking-core model.
  4. Carothers, W. H. "Polymers and polyfunctionality." Trans. Faraday Soc. 32, 39–49 (1936).
  5. Peters, M. S., Timmerhaus, K. D. & West, R. E. Plant Design and Economics for Chemical Engineers, 5th ed. McGraw-Hill (2003). Lang-factor guidance.
  6. Paszun, D. & Spychaj, T. "Chemical recycling of poly(ethylene terephthalate)." Ind. Eng. Chem. Res. 36, 1373–1383 (1997). Glycolysis review.
  7. Flory, P. J. & Rehner, J. "Statistical mechanics of cross-linked polymer networks." J. Chem. Phys. 11, 512–520 (1943).
  8. Horikx, M. M. "Chain scissions in a polymer network." J. Polym. Sci. 19, 445–454 (1956).
  9. Vieira, M. G. A. et al. "Devulcanization of natural rubber by twin-screw extrusion." Polymer Testing journal literature review (composite citation for extruder devulcanization process route).
  10. Sinha, V., Patel, M. R. & Patel, J. V. "PET waste management by chemical recycling: a review." J. Polym. Environ. 18, 8–25 (2010).
  11. EP0997252 — Reclaimed rubber and process for reclaiming vulcanized rubber (twin-screw extruder devulcanization); EP1435372 — surface-devulcanized rubber crumb process. European Patent Office publication server.
  12. AACE International Recommended Practice 18R-97 — Cost Estimate Classification System, Class 5 (concept screening, ±30–50 %).
  13. Argus Media. Argus Recycled Polymers, Issue 26-6, 6 February 2026 (rPET and rPE Europe, Asia and US price assessments).
  14. Sparrow, N. "Recycled Resin Markets Begin Year With Cautious Optimism." PlasticsToday, 27 January 2026 (ICIS market commentary).